Assignment Name:
Consultancy Services for Feasibility Studies, Preparation of Detailed Drawing, Design, Estimate with Environmental and Social Impact Assessment for Setting up an Electrical Testing Laboratory.
Name of Client :
Power Cell, MOPEMR
Detailed Description of Actual Services :
  • Assess the potential for setting up a world-class electrical product testing laboratory in Bangladesh.
  • Design the institutional organization as an independent authority of the proposed laboratory for testing and certifying of High-Voltage, Medium-Voltage and Low-Voltage electrical equipment.
  • Conduct a detailed feasibility study with cost estimates of goods, works, and services.
  • Prepare electrical and civil/architecture conceptual design and a list of all machinery and testing equipment, including their specification.
  • Recommend and prepare a management system for the testing laboratory including organogram, management hierarchy, personnel job specifications, and formation of the autonomous body according to policy/legal aspects.
  • Incorporate environmental issues in establishing the lab in the country context and review organizational setup and testing facilities of reputed international laboratories.
  • Review the fee structure for electrical tests carried out at international laboratories.
  • Prepare the phasing of tests to be carried out at the laboratory.
  • Recommend and standardize the fee structure for each test.
  • Prepare all administrative and legal documents necessary for setting up the laboratory.
  • Review existing electrical equipment testing laboratory facilities of other Power Division utilities and propose linkages in technical, financial, management, and HR aspects.
  • Review present manpower capabilities in public sector utilities for carrying out tests.
  • Recommend short-term and long-term capacity building programs for recruited manpower.
  • Review procedures for obtaining international accreditation for laboratories.
  • Prepare an action plan to obtain international accreditation.
  • Prepare necessary documentation for international accreditation.
  • Prepare total cost estimate for setting up the laboratories.
  • Review existing acts, policies, rules, regulations, and guidelines and recommend legal integration under existing laws.
  • Environmental Impact Assessment and preparation of EIA and IEE reports.
  • Social Impact Assessment and preparation of SIA report.

Assignment Name:  Consultancy Services for Survey, Planning, Design and Supervision of Construction and Renovation Works for Cumilla Zone Power Distribution System Development Project.

Name of Client :

Bangladesh Power Development Board (BPDB)

Detailed Description of Actual Services :

Ø  Route selection and preparation of the staking sheet for lines

Ø  Identification and recording of HV system, MV system, LV system and Service connection

Ø  Load Reading & Survey and Load Forecast

Ø  Detailed survey, planning, and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2030

Ø  Planning and detailed network design with related software (CYME or equivalent)

Ø  Preparation of bill of quantities and tender documents for distribution lines

Ø  Supervision of the Civil Construction Work for Lines

Ø  Supervision of Erection of the Pole and Installation of Hardware

Ø  Supervise the Stringing Works

Ø  Supervision of the quality of civil works and installation services carried out by the Contractor at the sites

Ø  Supervision of the installation of substation/distribution automation equipment and the installation of SCADA communication infrastructure

Ø  Establish the equipment requirements of materials/equipment

Ø  Supervise the Protection Related Works. Testing & Commissioning for Lines

Ø  Preparation of Engineering Report & As-built drawings

Ø  Store Inventories

Ø  Verifying the contractor’s bill according to the progress of work, if necessary

Assignment Name :
Consultancy Services for Feasibility Studies, Preparation of Detailed Drawing, Design, Estimate with Environmental and Social Impact Assessment for Underground Distribution Network in DESCO Area.
Name of Client :
Dhaka Electric Supply Company Ltd. (DESCO)
Detailed Description of Actual Services :
  • Detailed consumer survey for existing distribution network.
  • Topographic survey.
  • Inventory of existing distribution system, preparation of line sketch, fitting assembly unit, Single Line Diagram, material list, database and renovation & expansion plan.
  • Existing consumer survey and collection of relevant data to study voltage drop, line loss, fault level and load forecast finalization for underground conversion.
  • Feasibility study of underground distribution system in Uttara 3rd Phase and Purbachal New Town area under DESCO.
  • Preparation of BOQ, cost estimation, DPP, GTP, bid documents etc. for existing and proposed systems.
  • Drawing, design and estimation for construction of underground distribution system considering cable ducting system.
  • Detailed design of proposed system, line route survey and staking design.
  • 33kV/11kV substation design including civil works and foundation design.
  • Single Line Diagram of existing and proposed infrastructure from 33kV transmission to 0.4kV distribution line.
  • Preparation of sub-project proposal and engineering report.
  • Providing training for operation & maintenance planning and design.
  • Environmental Impact Assessment and preparation of EIA and IEE reports.
  • Social Impact Assessment and preparation of SIA report.
  • Preparation of Resettlement Action Plan (RAP).
Assignment Name :
Consultancy Services for Feasibility Studies with Environmental and Social Impact Assessment for Selection of Fuel Supply Route for 230MW Power Plant (Dual Fuel) at Kadda, Gazipur.
Name of Client :
Rural Power Company Limited (RPCL)
Detailed Description of Actual Services :
  • Consultancy services for feasibility study.
  • Survey and data collection for possible fuel supply route by road.
  • Survey and data collection for possible fuel supply route by river.
  • Survey and data collection for possible fuel supply route by railway.
  • Analysis and evaluation of survey data and reports.
  • Environmental Impact Assessment.
  • Economic analysis of possible fuel supply routes.
  • Finalization of the selected fuel supply route.
  • Preparation of field layout, design, and drawings of fuel supply works.
  • Preparation of bidding documents.
  • Environmental Impact Assessment and preparation of EIA and IEE reports.
  • Social Impact Assessment and preparation of SIA report.
Assignment Name :
Consultancy Services for Feasibility Studies with Environmental and Social Impact Assessment for Installation of 50MW Power Plant (Dual Fuel) for Chittagong Port Authority.
Name of Client :
Chittagong Port Authority (CPA)
Detailed Description of Actual Services :
  • Carry out survey and investigation of the existing power system and network of CPA.
  • Develop layout plan for recording details of power distribution lines and substations.
  • Initial Environmental Examination (IEE), Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA) study.
  • Preparation of Feasibility Study Report.
  • Preparation of Single Line Diagram (SLD) for existing distribution network and proposed system.
  • Detailed system study for construction of 50MW Dual Fuel Power Plant.
  • Study of existing substations and grid system.
  • Establish coordinated grid system for accurate interlinking of the whole area.
  • Grid identification references provided by CPA Engineer/Project Director reviewed and incorporated.
  • Designation of key ordinates aligned with the National Grid System.
  • Preparation of cost estimation.
  • Economic and financial analysis.
  • Preparation of Resettlement Action Plan (RAP).
Assignment Name: Consultancy Services for Preparation of a Layout Master Plan with Environmental and Social Impact Assessment for the Ghorashal, Goalpara and Baghabari Generation Hubs Name of Client: Power Cell, MOPEMR
Detailed Description of Actual Services:
  • Study and analysis of the Power Plant Complex
  • Study of an existing power plant
  • Identification of the site for the proposed power plant in the power plant complex area
  • Evacuation of power
  • Evaluation of the fuel supply system
  • Study and analysis of Road and Railway (if any) and river network and related structures and facilities
  • Study of the cooling system, cooling water discharge channel and related structures and facilities
  • Study of Existing Township, residential, cultural and commercial complex
  • Detailed Survey of Ghorasal, Goalpara and Baghabari Power Plant complex areas
  • Survey existing Grid substations with High Voltage Transmission line
  • Survey overland and underground facilities
  • Bathymetric survey of the rivers near the power stations
  • Preparation of Layout Master Plans showing both existing and proposed power plants
  • Environment Impact Assessment and Preparation of EIA and IEE report
  • Social Impact Assessment and Preparation of SIA report
  • Preparation of RAP
Assignment Name : Consultancy Services for Feasibility Studies, Site Selection, Environmental Impact Assessment, Preparation of Tender Document for Construction of 50 MW (±10%) Dual Fuel Power Plant at Kadda, Gazipur. Name of Client: Rural Power Company Limited (RPCL)
Detailed Description of Actual Services :
  • Comprehensive Feasibility Study
  • Preparation of Master Plan
  • IEE and EIA & SIA study of the Project
  • Topographic Survey and Soil Survey
  • Bathymetric and Hydrological Survey
  • Chemical Analysis of Ground Water Arsenic Survey Results
  • Output generated from frequency analysis of the water level of the NC region for the monsoon season by SWMC/IWM
  • Hydraulic properties of the cross-section of NC
  • Monthly decade-wise output generated from statistical analysis of water level for the dry period by SWMC/IWM
  • Monthly decade-wise output generated from the statistical analysis of water level for the monsoon period by SWMC
  • Hydrological data to determine the availability of adequate cooling water in the river adjacent to the site, impact of the discharge of hot discharge water from the cooling system in the river on marine life, flora & fauna, and navigability of the river for transporting machines and equipment
  • Engineering studies, load flow studies
  • Civil, electrical and mechanical design
  • Power evacuation studies etc.
  • HFO pipeline survey for carrying HFO from Dhirassram Railway Station to Kodda Project Site
  • Design of HFO tank of 2 X 5000-ton, Day tank (1000Ton), HFO treatment unit, LFO Tank (1000Ton)
  • Design of Jetty for HFO unloading
  • Design of pipeline and pumps from Jetty to HFO Tank & HFO Tank to Power Plant
  • Total Fire protection system of the Power Station & the whole area of the Power Station
  • Design of power station room, workshop and step-up sub-station
  • Design of Admin Building & Rest House
  • Preparation of Tender Document for the procurement of 52MW Dual Fuel Engine Generator
  • Design of Road for carrying HFO to the Site
  • Financial Analysis of the project and evaluation of the tariff of the energy.
  • Preparation of RAP
Assignment Name : Consultancy Services for Feasibility Studies, Site Selection, Environmental Impact Assessment, Preparation of Tender Document for Construction of 20 MW (±10%) Dual Fuel Power Plant at Rauzan, Chittagong. Name of Client : Rural Power Company Limited (RPCL)
Detailed Description of Actual Services :
  • Comprehensive Feasibility Study, including the selection of the site
  • Preparation of Master Plan
  • IEE and EIA & SIA study
  • Bathymetric and Hydrological studies
  • Hydraulic properties of Cross cross-section of SE
  • Monthly decade-wise output generated from statistical analysis of water level for the dry period by SWMC/IWM
  • Monthly decade-wise output generated from statistical analysis of water level for the monsoon period by SWMC
  • Carry out detailed studies and other Hydrological studies to determine the availability of adequate cooling water in the river adjacent to the site
  • Impact of discharge of hot discharge water from the cooling system in the river on marine life and flora & fauna
  • River for transporting machines and equipment and other Hydrological studies
  • Engineering Studies, Load flow studies
  • Civil, electrical and mechanical design, power evacuation studies, etc., of the project
  • Design of HFO tank of 2 X 2500-ton, Day tank (500Ton), HFO treatment unit, LFO Tank (500Ton)
  • Design of Jetty for HFO unloading, Design of Pipeline and pumps from Jetty to HFO Tank & HFO Tank to Power Plant
  • Total Fire protection system of the Power Station & the whole area of the Power Station
  • Design of power station room, workshop and step-up sub-station
  • Design of Admin Building & Rest House
  • Preparation of Tender Document for the procurement of 25MW Dual Fuel Engine Generator
  • Design of Road for carrying HFO to the Site
  • Financial Analysis of the project and evaluation of the tariff for the energy
Assignment Name : Consultancy Services for Feasibility Studies and Preparation Bid Document with Environmental and Social Impact Assessment for IPP Project of HFO Fueled Power Plant at Barisal 50 MW (±10%), Chittagong 100 MW (±10%), Khulna 100 MW (±10%) on a Build, Own and Operate basis undertaken by BPDB for KDS and PHP Group.Name of Client : Bangladesh Power Development Board (BPDB)

Detailed Description of Actual Services :

  • Complete Feasibility Study
  • Site selection for three locations
  • Preparation of Master Plan
  • IEE and EIA & SIA study of the Project
  • Associated Transmission Line for power evacuation
  • Topographic and Soil Survey
  • Hydrological Survey & Study
  • HFO pipeline survey for carrying HFO to the Project Site
  • Preparation of the master Plan for optimum utilization of the land
  • Design of HFO tank of 2 X 3500-ton, Day tank and HFO treatment unit
  • Fire protection system
  • Power station room and workshop
  • Step-up sub-station
  • Preparation of Bid Document for 100/50MW (±10%) Dual-Fueled Engine Generator
  • Design of Road for carrying HFO to the Site
  • Financial Analysis of the Project
  • Determination of EIRR and FIRR and Energy Tariff of the Power Station.
  •  
Assignment Name: Consultancy Services for Feasibility Studies with Environmental and Social Impact Assessment for 2 X 100MW Peaking Power Plant in the Dhaka Area under ADB Loan No : 150 1505 BAN (SF) : Ninth Power Project [Part : D]. Name of Client : Bangladesh Power Development Board (BPDB)
Detailed Description of Actual Services :
  • Survey for site selection
  • Carry out an environmental impact assessment
  • Hydrological and Bathymetric Survey
  • Engineering Studies
  • Civil, electrical and mechanical design
  • Power evacuation studies
  • Soil investigation and development design criteria for land development
  • Foundation and civil design and specification for electrical & mechanical plants
  • Meteorological investigations, topographical and geological survey
  • Detail layout
  • Financial & economic analysis
  • Detailed cost estimate & disbursement schedules
  • Detailed project engineering report
  • Finalization of detailed design for all civil, mechanical, hydrological and electrical aspects
  • Preparation of tender documents
  • Development of project management policy
  • Project organizational structure and report preparation
  • Environment Impact Assessment and Preparation of EIA and IEE report
  • Social Impact Assessment and Preparation of SIA report.
Assignment Name : Feasibility studies and Preparation of Master Plan & Tender Document with Environmental and Social Impact Assessment  for 3X210MW STPS and Drawing & Design of 230/132/33kV Substation and 230kV Transmission Lines for evacuation of power from Siddhirganj Power Plant to Haripur Power Plant and Meghnaghat Power Plants and also Hasnabad Grid & Maniknagor Grid. Name of Client : Bangladesh Power Development Board (BPDB)
Detailed Description of Actual Services :
  • Comprehensive feasibility study
  • System study, load flow studies
  • IEE, EIA and SIA studies
  • Bathymetric & Hydrological studies
  • Civil, electrical and mechanical design
  • Power evacuation studies
  • Preparation Master Plan
  • Detailed planning & design of the 230/132/33kV substation
  • Detailed planning & design of 230kV transmission line
  • Preparation of bid document
  • 230kV transmission line route from Siddhirganj to Haripur, Meghnaghat, Hasnabad & Maniknagar
  • Preparation of Master Plan for housing, living quarters & ancillary facilities, like market, mosque, club house, clinic and other facilities etc.
Assignment Name : Consultancy Services for Feasibility studies with Environmental and Social Impact Assessment  and Preparation of Master Plan for 4x450MW CCPP and Design of 230/132/33kV Substation and 230kV & 132kV Transmission Lines and Development of Master Plan for Meghnaghat Power Plant Complex. Name of Client : Bangladesh Power Development Board (BPDB)
Detailed Description of Actual Services :
  • Site survey & study
  • IEE, EIA & SIA Study
  • Transportation & approach route survey
  • Study for a fuel supply route and transportation network
  • Development of a master plan of the entire area for 4X450MW CCPP & common facilities
  • Study of fuel and gas supply route and transportation of fuel & Gas
  • Bathymetric and Hydrological Survey
  • Carry out detailed studies and other Hydrological studies to determine the availability of adequate cooling water in the river adjacent to the site
  • Alternative measure for the cooling of water impact of the discharge of hot discharge water from the cooling system in the river on marine life and flora & fauna
  • Navigability of the river for transporting machines and equipment and other Hydrological studies.
  • Engineering Studies, Load flow studies
  • Civil, electrical and mechanical design
  • Power evacuation studies etc.
  • Planning & design of intake water channel, discharge channel, hot water-cooling lagoon, sewerage & other services
  • Load flow & engineering studies
  • Planning & designing of the 230/132/33kV substation
  • Design a 230kV transmission line for the evacuation of power to the National Grid
  • Preparation of the bid document for the turnkey construction of the substation and transmission line
  • Identifying the locations of generation units
  • Planning and design for utilization of common facilities such as residences, living quarters, markets, clinics, mosques, recreation areas etc., provision for future expansion of 230kV transmission line.
Assignment Name :  Consultancy Services for Feasibility Study with Environmental and Social Impact Assessment  for Installation of 10 MWp Solar Power Plant at Balurchor Union, Shirajdikhan, MunshiganjName of Client : Knash Engineers Limited (KEL)

Detailed Description of Actual Services :

  • Topographic Survey, Field Survey and Data Collection
  • Prepare Detailed Feasibility Study Report for Establishing a Solar Power Plant.
  • Depending on the Land Area Available, Recommend the Plant Capacity.
  • Recommend the Method of Implementation of the Project Considering Economical, Financial, Commercial Aspect.
  • Recommend on the Method of Power Evacuation
  • Review the Available Technology in the Market and Recommend
  • Financial and Economic Analysis
  • Carry Out Soil Testing at the Site to Assess the Soil Condition and Load Bearing Capacity and Recommend the Kind of Foundation Required for the Solar Panels.
  • Carry Out Cost-Benefit Analysis for Different Technological Options for Solar PV.
  • Carry Out Cost Estimates for Development, Construction and Operation of the Project.
  • Required Data Collection, Analysis and Preparation IEE, EIA and SIA Study Report for Implementation of the Solar Power Plant.
  • Environmental Impact Assessment and Preparation a Environment Management Plan
  • Social Impact Assessment and Preparation a Social Safe guard policy
  • Collect Required Land Documents for Legal and Institutional Aspects of the Land, Environment and Other Issues for the Proper Implementation.
  • Prepare a Standard Tender Document for Implementation of Solar Power Plant.
  • Environment Impact Assessment and Preparation of EIA and IEE report.
Assignment Name :  Consultancy Services for Feasibility Study with Environmental and Social Impact Assessment  for Installation of 2 MWp Solar Power Plant at Balurchor Union, Shirajdikhan, MunshiganjName of Client : Knash Engineers Limited (KEL)

Detailed Description of Actual Services :

  • Topographic Survey, Field Survey and Data Collection
  • Prepare Detailed Feasibility Study Report for Establishing a Solar Power Plant.
  • Depending on the Land Area Available, Recommend the Plant Capacity.
  • Recommend the Method of Implementation of the Project Considering Economical, Financial, Commercial Aspect
  • Recommend on the Method of Power Evacuation
  • Review the Available Technology in the Market and Recommendation
  • Financial and Economic Analysis
  • Carry Out Soil Testing at the Site to Assess the Soil Condition and Load Bearing Capacity and Recommend the Kind of Foundation Required for the Solar Panels
  • Carry Out Cost-Benefit Analysis for Different Technological Options for Solar PV.
  • Carry Out Cost Estimates for Development, Construction and Operation of the Project.
  • Required Data Collection, Analysis and Preparation IEE, EIA and SIA Study Report for Implementation of the Solar Power Plant.
  • Environmental Impact Assessment and Preparation a Environment Management Plan
  • Social Impact Assessment and Preparation a Social Safe guard policy
  • Collect Required Land Documents for Legal and Institutional Aspects of the Land, Environment and Other Issues for the Proper Implementation
  • Prepare a Standard Tender Document for Implementation of Solar Power Plant
  • Environment Impact Assessment and Preparation of EIA and IEE report.